[1]
Ortiz-Pimiento, N.R. and Díaz-Serna, F.J. 2019. Relative Average Deviation as Measure of Robustness in the Stochastic Project Scheduling Problem. Revista Facultad de Ingeniería. 28, 52 (Jun. 2019), 77–97. DOI:https://doi.org/10.19053/01211129.v28.n52.2019.9756.